Non Standard Precision Steel CNC Machined Parts Non Threaded Base Bolt Screw

Still deciding? Get samples of $ !
Order Sample

Product Description

!
Basic Information
Model NO.:
A-144
Condition:
New
Certification:
CE, RoHS, GS, ISO9001
Standard:
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Material:
Metal
Service:
CNC Machining
Tolerance:
+-0.005mm
Surface Treatment:
Anodized, Sandblasting, Polish
Machining:
3/4/5 Axis CNC Machines
Delivery Time:
15-20 Days
P
Product Description
Non standard precision steel cnc machined parts non threaded base bolt screw

We provide a comprehensive range of processing services including: Machining, Milling, Turning, Drilling, Grinding, Boring, Broaching, Honing, Lapping, Threading, Knurling, Chamfering, Countersinking, Reaming, Facing, Slotting, Sawing, Sanding, Polishing, Buffing, and High Precision CNC Machining Fabrication.
CNC Milling Service

CNC Milling is a high-precision industrial technology used to fabricate parts from a variety of materials. Our computer numerical control milling machines are equipped with automated cutting programs and computer-controlled servo systems that guide the machine to cut workpieces with extreme precision. It is widely used in automotive, aerospace, and medical industries for consistent, high-quality results.

S
Technical Specifications
Material Options Carbon steel, SPCC, SGCC, Stainless steel, Aluminum, Brass, Copper, etc.
Processing Methods Laser Cutting, Precision Stamping, Bending, CNC Punching, Threading, Riveting, Drilling, Welding, etc.
Surface Treatment Brushing, Polishing, Anodizing, Powder Coating, Plating, Silkscreen printing, Sandblast.
Tolerance +/-0.005mm to +/-0.2mm, 100% QC quality inspection.
Drawing Formats DWG, DXF, STEP, IGS, 3DS, STL, SKP, AI, PDF, JPG.
Sample Lead Time 1-3 workdays (standard); 3-5 workdays (with surface treatment).
M
Materials & Capabilities
F
Frequently Asked Questions
What kind of production services do you provide?
We provide mould making, die casting, CNC machining, stamping, plastics injection moulding, simple assembly, and various metal surface treatments.
How long is the typical lead time?
For moulds, it takes 3-5 weeks. For mass production of parts, the lead time is generally 3-4 weeks depending on complexity.
How do you ensure product quality?
Our production is executed strictly according to ISO9001 quality systems. We perform 100% inspection before shipment and provide replacement for any quality issues.
How long does it take to receive a quotation?
After receiving detailed information (drawings, material, quantity), we typically provide a formal quote within 2 business days.
What are the required elements for a quote?
Please provide technical drawings or physical samples, specifying the material, required finish, and desired quantity.
What is the standard payment term?
For goods: 30% prepaid deposit, with the balance settled via T/T before shipment. For moulds: 30% prepaid, 40% after mould completion, and the balance after sample approval.
Banner

Related Products