⚙️
Basic Information
Standard:DIN, ASTM, GOST, GB, JIS, ANSI, BS
Material:Metal
Application:Metal Processing Machinery Parts
Surface:Powder Coating, Plating, Anodization
Tolerance:0.05mm - 0.1mm
Process:Laser Cutting, Bending, Stamping, Welding
Capacity:500,000 PCS/Month
Origin:China
🏢
Manufacturing Excellence
Our facility was established in 2019 as an independent private enterprise integrating R&D, production, and service. We focus on CNC precision machining parts, which are mainly used in robotics, communications, electronic appliances, 3C smart wear, automobiles, medical care, and automation equipment. Our core competitiveness lies in rapid response, a robust quality assurance system, and efficient cost control. We provide customers with value-added services through technical support and high-quality product processing.
The factory is equipped with 16 high-precision automatic CNC lathes, 12 CNC machining centers, and 4 high-precision turning-milling complexes. Our machining accuracy reaches up to 0.008mm. Testing instruments include quadratic elements, micrometers, altimeters, projectors, and calipers, managed by experienced engineers and inspectors to ensure satisfactory product quality.
❓
Frequently Asked Questions
What information is required for a quotation?
You can provide 2D/3D drawings (STEP, STP, CAD, PDF) or send your physical samples to our factory, and we can quote based on those details.
Can we sign a Non-Disclosure Agreement (NDA)?
Of course. We strictly protect our customers' intellectual property and will never disclose information to third parties.
Do you provide samples before bulk orders?
Yes, we provide prototype samples for verification and testing before proceeding with mass production.
How do you ensure the quality of parts?
We have a dedicated professional quality control department equipped with CMM and optical instruments to perform thorough inspections at every stage.
What is the typical delivery time?
For inventory items, it takes about 3 days. For mass production, it is typically 20-25 days after receiving the deposit, depending on the project complexity.
What transportation methods are available?
We offer flexible shipping options including sea freight, air freight, or door-to-door express delivery based on your requirements.